Manufacturers
Machining, fabrication, assembly and suppliers handling varied part numbers, frequent setups and demanding delivery schedules.
Look for: intermediate stock, repeated expediting and machines waiting for material or instructions.
FOR OWNERS WHO NEED MORE THAN ANOTHER REPORT
Turn daily firefighting into clear priorities, reliable delivery and capacity your business can actually use.
Practical consulting for high-mix manufacturers and technical service companies. Built around your people, your processes and the tools you already have.
01 / THE APPROACH
Busy departments do not necessarily mean a healthy business. Work can move quickly at each station and still spend days waiting between them.
A structured application of lean manufacturing, the Theory of Constraints and queueing principles to high-variety, low-volume operations.
Four implementation pillars establish visibility, measurement, flow and planning. The fifth—understanding the specification and its function—runs across every phase.
Explore the application manual ↗Map where real work waits, how long it waits and who owns the next step.
OUTPUT / Stoppage Map and baselineMake the constraint visible with a small daily board and paired indicators.
OUTPUT / Daily board, targets and action ownersReduce avoidable hand-offs and test a Start-and-Finish flow, with risk assessment before changes.
OUTPUT / Pilot flow and updated skills matrixConnect sales promises, purchasing and production to real capacity and a protected planning horizon.
OUTPUT / Management cadence and urgency rulesQuestion the specification, clarify its function and give the people executing it the critical information.
OUTPUT / Critical Item Sheet and specification reviewChanges to stations, layouts and workloads include risk assessment. Quality, inventory and near-miss reporting help keep productivity targets from hiding new problems.
A CORE PRINCIPLE
“Do not accumulate” means matching each routine to the pace of the decisions it controls.
02 / ENGAGEMENTS
Each engagement defines deliverables, responsibilities and completion criteria. No blanket performance promises or company-wide rollout before a pilot.
Reference duration: 2–3 weeks
Follow two or three representative flows and establish the baseline before deciding what to change.
Apply the relevant pillars to one family of products or services. Establish daily information, test the flow and train an internal owner.
Reference phases in the manual: Measure 3–4 weeks; Flow 6–8 weeks; Synchronize 6–8 weeks. Scope and timing are adjusted after diagnosis.
Connect commercial commitments and operational capacity, then transfer ownership to your team.
The manual’s sustain criterion is routines maintained for 90 days without outside support—not a guarantee of a fixed implementation timeline.
03 / WHERE IT FITS
Machining, fabrication, assembly and suppliers handling varied part numbers, frequent setups and demanding delivery schedules.
Look for: intermediate stock, repeated expediting and machines waiting for material or instructions.
Engineering offices, maintenance, field service and technical teams managing projects, cases and approvals.
Look for: open cases, overloaded specialists and work waiting between approvals.
Designed primarily for high-mix operations of 20–250 people. Dedicated high-volume lines, continuous processes and businesses constrained by insufficient demand may need a different approach.
04 / THE FOUNDER
Production engineering — mechanical specialization
Occupational safety engineering
Professional qualifications in Brazil · CREA-SC
Built from work in design, purchasing, production planning, engineering and industrial coordination.
The method systematizes practices applied in manufacturing and occupational safety consulting through Sense Engenharia: material and process qualification, daily production information, setup improvement and coordination between the customer’s needs and factory capacity.
It connects operational improvement with the safety implications of changing workstations, layouts and responsibilities.
Services requiring U.S. professional licensure or local approvals must be scoped in accordance with the applicable requirements. Brazilian qualifications do not represent U.S. licensure.
THE REFERENCE DOCUMENT
The application manual sets out the principles, procedures, paired indicators, management cadence and gate criteria. It includes a self-assessment and templates for the Stoppage Map and Critical Item Sheet.
APPLICATION MANUAL
English edition · Revision 1.1
19 pages · PDF
LET’S TALK
Start with the business problem. We can then assess whether the method fits, which flow to examine and what a first engagement should include.
To make the first conversation useful, include:
Please do not send customer drawings, personal information or confidential production records in an initial email.